As a part of station improvement work at Mira Road station, the south-side staircase of the second southernmost Foot Over Bridge (FOB) at Platform No. 1 requires dismantling.
In view of the above, the said staircase will remain closed for commuters from the night of 25th July, 2025. Commuters can use the existing staircases, escalators, and elevators connected to the Middle FOB, North FOB, and South FOB at Platform No. 1 of Mira Road station.
Mumbai News: BMC Sanitation Workers Call Off Strike After Assurances On Job Security, Regularisation Of Contract StaffInconvenience to the passengers is highly regretted.
You may also like
Kenneth Washington dead: Star Trek actor dies as tributes paid
FPJ 97th Anniversary: Building Smarter With Tech
Mercedes make final decision on signing Max Verstappen as Toto Wolff breaks silence
Sir Bob Geldof condemns 'abysmal' starvation of kids in Gaza as he issues plea
Madhya Pradesh 15 Key Bills In Queue For Assembly Monsoon Session